Concrete Floor

Newly finished basement floor

  1. We will break up your existing floor and dig down approx. 8”. 
  2. At that point you could have a plumber come in and change all old clay piping to new pvc/abs piping. 
  3. We then treat all of your interior walls with delta membrane and put interior clothed weeping tiles directed to a sump barrel. 
  4. At this point you also have an option to choose if you want to put down 2′ insulation or have in floor heating installed
  5. 4” of gravel is then laid on top covered by 6mil poly and with wire mesh
  6. We pour a 4” concrete slab leveled with a smooth finish. 
  7. Approx. start to finish 7-10 working days

Copyright © 2025 Mud Monkeys Inc. - All Rights Reserved.

Powered by GoDaddy

  • About Us
  • Services
  • Gallery
  • Contact Us

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept